Atmos - Effective Acoustics, Müllendorf, Austria / Room acoustics
The Höcker Polytechnik Painting Center offers on an area of only 73 m2 everything that is needed for an efficient painting operation - paint preparation, painting area, evaporation zone and technical room. Energy consumption is reduced by modern LED lighting and energy-efficient extraction.
At a glance
- with integrated exhaust area
- 26 m2 large paint booth
- 29,000 m3 Air exchange
- LED lighting (Ex-protected)
- drying room
incl. central control system SPS technology, panel and frequency converter operation